БЕМП - Производственное объединение БЕМП - Производственное объединение
RU
ENG
About us Catalogue Branch Offices Our partners & customers Contact us Corporate news Announcements References

News

  1   2  3  4  5  6  7  8  9 
July 8th, 2008 10kV switchgear in 4 modules is manufactured and loaded for Lukoil subdivision. Indoors the switchgear the system of overpressure maintenance «Airhead» is fulfilled.


July 3rd, 2008 At the beginning of June deputy director Mr.Kraev Vyacheslav gave interview to «Oiltech» magazine and answered the questions of its correspondent…


June 30th, 2008 BEMP technicians invented standard cabinet for remote control of the complete transformer substation and the switchgear 6/10 kV used in the oil and gas industry.


June 26th, 2008 First supply of the equipment to Rosneft is fulfilled.


June 21st, 2008 In second quarter 2008 BEMP began manufacturing regular KTPK Taiga for Russian Railways


June 9th, 2008 Annual exhibition «Russian Coal and Mining 2008» is one of the ten largest exhibitions in Europe. Complete Transformer Substation Taiga all set was presented at the exhibition.


May 12th, 2008 Увеличение численности Управляющей компании «БЭМП» (Санкт-Петербург) с 21 сотрудника (2005 год) до 64 сотрудников (2008 год), явилось предпосылкой к расширению и качественному улучшению офисных помещений.


May 5th, 2008 Минимальные сроки поставки комплектной дизельной электростанции — ДЭСК «Тундра», позволили…


April 26th, 2008 Здоровый микроклимат в коллективах компании позволяет совершенствоваться не только в рамках служебной деятельности, но и…


April 20th, 2008 С 16 по 18 апреля ведущие Топ менеджеры «БЭМП» приняли участие в семинаре, организованном компанией «Шнейдер Электрик» по теме «Оптимизация эффективности продаж решений».


  1   2  3  4  5  6  7  8  9 
Leningradskaya oblast, Boksitogorsk.
Tel/Fax (81366) 2 10 90
St.Petersburg, 8 Sofiyskaya Str.
Tel/Fax (812) 703 11 44.
Moscow
Tel/Fax (495) 980 69 67
PortPC Design © 2008